Planning Issues
planning issues like cannot close gaps.
By Charnjit1 author63 articles
- Cannot close gaps between certain tasks or works orders
- Some works orders and tasks are planning to the wrong resource
- Increase the default plan length of time to plan works orders in future years
- How to use options Search for unpegged items and Check downstream planned usage
- Error: 'Order Code: XXX No steps found in the process default' when trying to add order to the plan
- Some tasks are scrambled and overloaded some resources when planning works orders
- Unplanned values of components or missing components from task KPIs
- Error: 'Please check the dependencies on the following tasks' when locking lots of tasks or planning works orders
- How can you auto-refresh the plan by user basis
- Error: 'The added or subtracted value results in an unrepresentable DateTime'
- Horizontal scroll bar jumps too far along the plan and the font size inside the tasks has changed
- Error: 'No Feasible Result' when trying to plan works orders
- Cannot drag tasks
- Error: 'The plan contains issues that are preventing the plan from being saved'
- Error: 'Orchestrate Planner has stopped working. A problem caused the program to stop working correctly'
- Unexpected error when TimeSpan duration is too longThis article explains why a TimeSpan overflow error may occur and outlines the checks and actions needed to resolve the issue and prevent it from happening again.
- How to archive completed tasks within a specific range
- Item setup time not working for same items
- Some tasks overlapping on some resources but not on others
- Error: 'Object reference set to an instance of an object' when planning some works orders
- Orders not planning on resource on the correct date
- Lots of works orders moved years ahead on the Gantt Chart
- How to change the colour by legend for additional attributes
- Non-working time not showing on the plan because default planning range is out of synch
- Shuffling logic skipped when it shouldn't as broken dependency links are generated
- Error: 'process not found' when adding some works orders
- Created manual tasks and they disappear after saving the plan
- Add some downtime to a resource with a unit value and cannot drag task past this section
- Unlocking a pegged task loses there pegging links
- Error: 'Collision occurred on template steps'
- Some tasks overload or move too far forward when changing shift rotation cycle and adding some task notes
- How to change the status of a task or group of tasks
- Cannot change the task status again after completing task from the actuals tab within edit tasks
- Insert manual task and plan slows down
- Planning Forwards and Backwards
- Late Task not Properly Highlighted by the Colour By Legend
- When entering a new time to move a task, undo and redo the action, the same task moves to a different time
- Split tasks
- Shuffling to affect timings on locked tasks and to ensure shuffling is called on Undo/Redo
- When completing tasks, some other tasks disappear
- Add the associated linked locked task(s) in the message: 'Not able to apply changes as the task is linked to a locked task'
- How to use the Align To Status Date
- Some tasks keep going back to original place after dragging them forward on the plan
- Start time or work duration changed on task but planners see different Start or Finish times from the same task
- Orchestrate: Planned Start Date does not update from the order planner
- Ability for multiple users to edit multiple menu forms at the same time
- Locked tasks are not unlocking after saving changes on the plan
- Component shortage not shown in task overview for some tasks
- Plan freezes or crashes when planning works orders
- Lateness figure is too high when planning works orders
- When planning new works orders, some tasks complete automatically
- Plan Recreating Setup Work On Save Where Previously Completed
- Tasks are planning 24/7 and ignoring the shift pattern
- Change default colour of a specific task status
- Changes to Track Order Quantity by one user silently overwrites changes to Task Quantity by another user on F5
- How to lock and unlock tasks
- Task bar labels not displaying full description or missing any labels
- Orchestrate changes the sequence of planned Tasks when adding a Works Order to the Plan
- Orchestrate schedules Task later than expected causing resource overload
- Task dependencies not updating with start date change
- Works orders update times and actuals quantity start and end times are an hour out
- The red flag on the end of a taskbar
- Lateness days is not updating after the task is moved on the plan