Task planning delay despite existing buffer stock.
Task requiring buffer items is planned late and pegged to a future item task, despite existing stock of the buffer.
The task that requires this item/buffer shows that the items that requires are planned late, and it pegged to an item task that is planned in the future, even though there is already an existing stock of that buffer.
The functionality has been enhanced in Orchestrate version 7.84. Please upgrade to this version or above.