FM/ORCH integration
data import fixes from FactoryMaster
By Charnjit and 1 other2 authors24 articles
- Error: 'PART DESCRIPTION has a quantity less than or equal to 0'
- Error: 'Merge Task KPIs unknown job code' when importing data from FactoryMaster
- Change route of works order in FactoryMaster and when export back resource codes in operations turn blueThis article explains what causes the resource codes in operations to turn blue after exporting back into FactoryMaster.
- Error: 'Execution Timeout Expired' when importing Part Numbers or Supplier Accounts
- Overlapping setup time when planning works orders
- Error: Violation Of Unique Key Constraint 'IX_orc_Items_ItemCode'. Cannot insert duplicate key in object 'dbo.orc_Items'
- Error: 'Response status code does not indicate success: 401 (Unauthorised)'
- How to import tooling from FactoryMasterCan the integration from Factorymaster to Orchestrate be changed to include tooling?
- The link between setup times of tasks is inaccurate because plans at the start of the work time instead
- Error: 'Unknown KPI code' during data import
- Works order operations amended within Factory Master, and after an data import, they plan too far ahead
- How do Subcon processes work within the FactoryMaster integration
- How the integration imports the resources generating with a prefix of M or L
- When assemblies orders are amended in FactoryMaster they lose links with sub-assemblies orders after import
- The task from the sub-works order is not planning before the associated task of another sub-works order
- How to import data from the play system
- Error: 'Invalid PrimaryResourceGroupCode'
- Error: 'Order code 1234 some tasks are not plannable. check the resource rules are not preventing these tasks from being planned'
- Orchestrate: FactoryMaster stock that is not available is being interfaced to Orchestrate
- Error: 'Execution Timeout Expired...' when importing works order components
- Explanation of the different FactoryMaster data import options
- Every task is showing as ready to start when they are completed operations
- Export to FM is incorrectly applying the MA lead time of the part to the purchase order
- Error: 'Execution timeout expired' from view WorksOrderDetail 3 associated labour