On top of the existing v7.84, here are the fixes included in this hotfix:
Stop plan copies reshuffling plans that share shift patterns, and save Allow Overloads per plan
Copying a plan no longer moves tasks. Before, after you copied a plan, opening the copy could move tasks a few days forward on the copy, on the source plan, and on any other plan using the same shift patterns.
Allow Overloads is now saved with each plan and restored when the plan is opened. Before, it was always off when a plan was opened. Copies of a plan keep its setting.
Plan Properties has a new Users may change Allow Overloads option. Only the admin user can change it, or the Allow Overloads setting itself. When it is cleared, Allow Overloads can't be changed from the toolbar or menu, and a message explains that it is set in Plan Properties. Existing plans open with Allow Overloads off and users still allowed to change it, which is the same as before.