  • Rate value changing to negative run rate in work list view.

  • RateType = 0 when greater than or equal to Mins/Item

  • RateType = - 1 OR RateType = NULL when greater than or equal to Not Set

  • -1 gets set when the planner enters the Edit Tasks panel and change some other properties of the task and save the changes.

  • Planner has created tasks that have RateType = -1 and RateValue = -1. These tasks are using fix duration as opposed to fix rate or rate table. They planned the works orde, selected the Task Overview, then, spotted the RateValue = -1.


This functionality has been enhanced in Orchestrate version 7.62. Please upgrade to this version or above.