Save the plan and loads of red flags generate about edit conflicts.
If the multiple invalid task edit conflicts are due to production KPIs (prod/usage tab of Edit Tasks), the functionality has been enhanced in Orchestrate version 7.77 hotfix 20. Please upgrade to this version or above.
If the invalid task edit conflicts are due to timings or Item Production Rates, the functionality has been enhanced in Orchestrate version 7.77 hotfix 30. Please upgrade to this version or above.
If the issue continues to occur, enabling the system parameter 'Full Refresh After Plan Save' from Orchestrate System Manager resolves the issue (performs full refresh after saving the plan, to prevent attribute changes going out of synch). Please complete the following steps:
Log into Orchestrate System Manager
Select File
System Settings
Select planning tab
Scroll down and click On for Full Refresh After Plan Save
Click OK
Select File, Exit
βNote: you will have to log out and back into Orchestrate for the system parameter to take effect on the plan.
